05.07.2021

Sorry, this entry is only available in Russian and Chinese.
Analytics on topic
Report
31.08.2022
Report
31.08.2022
Rail Container Transportation in Eurasia in the First Half of 2022

In the first half of 2022, 307,200 TEUs were transported along the China — Europe — China Eurasian railway route, which is 8.7% less than in the same period in 2021.

Article
27.12.2023
Landmark megaproject: Kazakhstan and Uzbekistan to be connected via new railroad

Construction of a new railway line Darbaza — Maktaaral with a length of 152 km started in Turkestan region. Alikhan Smailov, Prime Minister of the Republic of Kazakhstan, gave an official start to the works in the mode of teleconference.